Solar Panel FAQ — Edinburgh
How much do solar panels cost in Edinburgh?
Every Edinburgh solar installation is priced at survey. The cost depends on system size, roof type, access requirements (scaffolding on tenements or slate roofs), whether you add battery storage, and whether you're in a conservation area that requires a planning application. 0% VAT on solar panels and batteries until 31 March 2027. Your survey produces a written quote for your property, and the full price is confirmed on your written quote.
Are there grants for solar panels in Edinburgh?
There is no general grant for solar panels on their own in Scotland. Some means-tested schemes exist for lower-income households, and we will say honestly if you might qualify. 0% VAT on solar panels and batteries until 31 March 2027. Loans available, subject to status. Once your system is installed and registered, you can also receive smart Export Guarantee payments, with rates set by each supplier.
Can I install solar panels in an Edinburgh conservation area?
Yes — solar panels can be installed in Edinburgh conservation areas, but you will usually need full planning permission from City of Edinburgh Council rather than relying on Permitted Development Rights (PDR). Edinburgh has over 50 conservation areas, including Morningside, Marchmont, the Grange, Corstorphine, and the entire Old Town and New Town UNESCO World Heritage Site. The planning application is handled as part of the project. Applications are more likely to succeed where panels are positioned sensitively (e.g. rear-facing or screened from street view).
Can I put solar panels on an Edinburgh tenement?
Yes — top-floor tenement owners in Edinburgh can install solar panels on the shared roof, but you need written consent from co-owners under the Tenements (Scotland) Act 2004. The Act governs alterations to common parts of tenement buildings. Systems are typically sized at or below 3.68 kWp to stay within the G98 simplified DNO notification limit. The co-owner consent process and SP Energy Networks (SPEN) notification are managed as part of the project.
Can I install solar panels on a listed building in Edinburgh?
Solar panels on listed buildings require listed building consent in addition to any planning permission. Category A and Category B listed buildings are common in Edinburgh's Old Town and New Town. Consent is not guaranteed — City of Edinburgh Council and Historic Environment Scotland assess the impact on the building's character. Roof-integrated (in-roof) panels or rear-facing installations are more likely to receive consent. Contact us for an assessment of your listed property.
What is the DNO process for solar panels in Edinburgh?
Edinburgh is in the SP Energy Networks (SPEN) distribution area. For systems up to 3.68 kWp (single-phase), a simplified G98 notification is sent to SP Energy Networks and connection is typically confirmed within 10 working days. Systems above 3.68 kWp (up to 50 kWp) require a G99 application, which takes 45–65 working days and may involve a network study. All DNO paperwork is handled for you. SP Energy Networks may require an export limitation device on larger systems if the local network is constrained.
How long does a solar panel installation take in Edinburgh?
A typical Edinburgh solar installation takes 1–2 days of on-roof work once scaffolding is erected. The overall timeline from survey to switch-on is usually 6–10 weeks, including survey, design, any planning application (add 8–12 weeks for conservation areas), equipment ordering, SP Energy Networks notification or application, installation, and commissioning. Tenement installations may take longer due to co-owner consent requirements.
Is battery storage worth it in Edinburgh?
Battery storage tends to suit Edinburgh homes with a time-of-use tariff, or households that want to use more of their own solar generation. A battery stores surplus daytime solar for use in the evening and can also charge from cheaper overnight electricity for use during peak hours. Without a time-of-use tariff, the case is weaker. Batteries are priced at survey, and any savings are confirmed on your written quote, based on your actual usage pattern.
Can I combine solar panels with a heat pump in Edinburgh?
Yes — solar PV and an air source heat pump (ASHP) complement each other well in Edinburgh. Solar generation during spring and autumn offsets some of the electricity your heat pump uses for heating and hot water. We install through MCS-certified partners. Both systems are priced at survey. Loans available, subject to status. Some means-tested schemes exist for lower-income households, and we will say honestly if you might qualify.
What is MCS certification and why does it matter?
MCS (Microgeneration Certification Scheme) is the UK quality standard for small-scale renewable energy installations. MCS certification matters because it is a prerequisite for the Smart Export Guarantee (SEG) — without it, your energy supplier is not obliged to pay you for exported electricity. MCS certification also means your installation is designed and installed to defined standards. We install through MCS-certified partners. Warranty and guarantee terms are confirmed in writing on your quotation.
How much electricity will solar panels generate in Edinburgh?
Edinburgh's average annual solar yield is 894 kWh per kWp of installed capacity (source: MCS), which is above the Scottish median of 850 kWh/kWp. A typical 4 kWp system will generate approximately 3,576 kWh per year. Actual yield depends on roof orientation (south-facing is optimal), pitch (30–40° ideal), shading, and weather. East-west splits generate 10–15% less than south-facing but spread generation more evenly across the day.
How do export tariffs work for solar panels in Edinburgh?
The Smart Export Guarantee (SEG) requires licensed energy suppliers to offer a tariff for electricity you export to the grid. Smart Export Guarantee payments, with rates set by each supplier. Export income is never guaranteed, so check current rates with suppliers. Your system must be MCS-certified and you need a smart meter or export meter. You can only be on one SEG tariff at a time. Electricity you don't use in the home is exported and paid at your SEG rate; adding battery storage lets you use more of your own generation and export less.
Solar & Energy Glossary
Key terms used across this site and in quotes, surveys, and contracts.
- MCS
- Microgeneration Certification Scheme — the UK quality standard for renewable energy installations. Required for Smart Export Guarantee eligibility.
- SEG
- Smart Export Guarantee — the scheme requiring licensed energy suppliers to pay households for electricity exported to the grid from certified installations. Rates are set by each supplier.
- DNO
- Distribution Network Operator — the company that owns and operates the local electricity network. Edinburgh's DNO is SP Energy Networks (SPEN).
- kWp
- Kilowatt-peak — the maximum output of a solar panel or system under standard test conditions. Used to rate system size.
- kWh
- Kilowatt-hour — a unit of energy. One kWh is the energy used by a 1 kW appliance running for one hour. Electricity bills are priced per kWh.
- EPC
- Energy Performance Certificate — a rating (A–G) of a property's energy efficiency. Required when selling or letting. Solar panels can improve your EPC rating.
- G98
- The simplified DNO notification process for connecting generating equipment up to 3.68 kW (single-phase) or 11.04 kW (three-phase) to the electricity network.
- G99
- The full DNO application process for connecting generating equipment above 3.68 kW (single-phase). Requires a network study and takes 45–65 working days.
- ECO4
- Energy Company Obligation 4 — a UK Government scheme requiring large energy suppliers to fund energy efficiency measures in eligible (means-tested) households.
- SPEN
- SP Energy Networks — the Distribution Network Operator for Edinburgh and central/southern Scotland. Part of the ScottishPower group.
- ASHP
- Air Source Heat Pump — a heating system that extracts heat from outdoor air and transfers it inside.
- COP
- Coefficient of Performance — a measure of heat pump efficiency. A COP of 3.0 means the heat pump produces 3 kWh of heat for every 1 kWh of electricity consumed.
- SAP
- Standard Assessment Procedure — the UK Government's methodology for assessing the energy performance of dwellings. Used to calculate EPC ratings.
- PDR
- Permitted Development Rights — planning rights that allow certain building works (including solar panels in most cases) without a formal planning application. Removed in conservation areas and for listed buildings.
- RTE
- Round-Trip Efficiency — the percentage of energy stored in a battery that can be retrieved. A typical home battery has an RTE of 90–95%.
- Inverter
- A device that converts direct current (DC) from solar panels or batteries into alternating current (AC) used by household appliances and the grid.
- Smart Export Guarantee
- See SEG. The scheme that replaced the Feed-in Tariff (FiT) for new installations from 1 January 2020.